803-325-9977

Overview of Past Projects
INSTITUTIONAL / EDUCATIONAL
We have served as the general contractor for a variety of projects, including:
-
Constructing a training facility for line workers at York Technical College
-
Renovating the exterior of Clemson's Baruch Institute of Coastal Ecology in anticipation of its 50th-anniversary celebration
-
Refinishing the food preparation flooring at the Columbia
-
Replacing exterior windows at the Waccamaw Mental Institute
-
Overhauling the entire glazing system of the solarium at USC's Gregory Health and Wellness Center in Lancaster, SC
-
Building an ADA-compliant bleacher pad restroom access at Sullivan's Middle School in Rock Hill.

Installation of 1,000 LF of 24" Water Line to Accommodate New Water Tower for York County
"While working on this project, we were very poignant about the materials and footprint of our work. We worked with the client to manage their expectations and deliver the results they desired. At RNF Construction, our goal is to bring our clients’ vision to life while working with them every step of the way." - Peter Nash, Managing Principal at RNF Construction

MUNICIPAL / SCDOT
Project Highlights
-
Renovated and constructed new streets, sidewalks, curbs, storm drainage systems, and culverts for the City of Rock Hill, including the main parking lot behind the retail area.
-
Successfully bid for and completed a significant culvert replacement for Rock Hill's Grand Oaks community, featuring:
-
Extensive temporary utilities bypass operation
-
Surface street repaving without loss of utility access
-
-
Developed ADA access capabilities for Clover's Community Center.
-
Awarded a contract for a complete interior refurbishment of the Department of Social Services building in the downtown area.

PARKS
RNF's first-ever job was building a boat ramp providing access to the Catawba River at Rock Hill's Riverwalk Park. This was highly specialized work, including the use of a Porta-Dam to create a dry area to pour a portion of the striated concrete ramp over 50 feet into the river. RNF then bid, won, and provided clearing, grading, paving, and storm water bridging for over a mile of an extended walking trail leading to the boat launch.
After successfully completing this Riverwalk Park work, RNF was tapped by York County to construct a custom-built gatehouse at the Ebenezer Marina near Rock Hill.
One of RNF's most extensive and recently completed jobs was to enhance/enlarge the paved parking capacity for two of North Carolina's Crowders Mountain State Park locations by over 400 spaces with ancillary sidewalks, storm drainage, and restroom facilities.

PRIVATE RESIDENTIAL / CAMPGROUNDS
We have provided numerous negotiated construction services for various D.R. Horton projects throughout the region, including the construction of amenity area pavilions and stormwater detention ponds.
We were also selected by a Campgrounds of America operator near Tega Cay to complete a sanitary wastewater line refurbishment and extension project.

PUBLIC UTILITIES
Highlights include:
* A wet tap into a 24-inch waterline for York County and installation of nearly 1,000 feet of 24-inch water line to support the construction of a new water tower currently underway.
* A complete overhaul of Clover’s 50-year-old wastewater treatment facility, including installation of new pumps, aerators, electrical upgrades, and replacement of the outdated paddle system.
* Installation of 3,800 linear feet of new 8-inch waterline along Billy Howey Road for Union County, NC.
* Serving as a subcontractor for Holzheimer Construction, Inc., performing the relocation of 325 linear feet of 16-inch ductile sanitary sewer line for York County in the Paddlers Cove community, including full management of temporary bypass set-up and testing.
* Utility installation for Rock Hill’s Sullivan Middle School new concession complex, encompassing 1,100 linear feet of sewer, water, and dry utility site work.

SAMPLE SPECIALTY JOBS
RNF won the bid to perform the ground-up construction of the new 1,700 SF Chester County Animal Shelter, an outdoor pole building containing block kennels for 30 dogs, which the company completed in March 2020.
As part of the Riverwalk boat launch job, RNF was responsible for organizing and manning a Porta-Dam system to create the dry area necessary to pour a portion of the striated concrete boat ramp over 50 feet into the Catawba River.
As part of the Crowders Mountain State Park parking expansion job, RNF was responsible for replacing a failing septic system with an entirely new one to service the public restroom facility at the Linwood location.
As part of the Crowders Mountain State Park parking expansion job, RNF was responsible for the site preparation for in-ground vaults and installation of a 30-ton pre-cast public restroom facility for the expanded Shorts Lake parking lot.
RNF was awarded the publicly bid job to completely re-do all the food preparation areas at The Columbia Zoo, a job it completed to the staff’s complete satisfaction in 2018.



